Unit 2 at Diablo Canyon returned to service
SAN LUIS OBISPO COUNTY, Calif. - One of the two units at Diablo Canyon Power Plant is now operating at 100 percent power again.
PG&E said Tuesday that Unit 2 had been returned to service.
It was shut down on Thursday to perform maintenance on the control rod drive system.
The utility said the work could not be done while the unit was still operating.
PG&E said both units were safely operating at full power as of Tuesday.